Vilar-Hoynack Construction Company | Lynx CNG Station and Maintenance Facility Upgrades Design Build
6845
portfolio_page-template-default,single,single-portfolio_page,postid-6845,qode-quick-links-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-11.1,qode-theme-bridge,wpb-js-composer js-comp-ver-6.9.0,vc_responsive
‹ Back to Projects

Lynx CNG Station and Maintenance Facility Upgrades Design Build

Note: These projects were completed by the Vilar-Hoynack team while at different organizations.


Category
General, Industrial & Biotech
About This Project

This project was a design build project which included a new CNG Dispensing station and upgrades to existing maintenance facility to allow for maintenance of all CNG enabled vehicles.