Baptist Hospital BETHESDA HOPSITAL install ge ct scanner
Construction Cost
$857,003
Overview
The project consisted of installing a GE CT scanner into the CT area located on the first floor at Bethesda Hospital East in a former linear accelerator room. The room was altered to conform to the CT scanner.