Loader
MNC915 UMHC 1st Floor X-ray Replacement
Healthcare

MNC915 UMHC 1st Floor X-ray Replacement

Construction Cost
$457,797
Project Size
310 SF

Overview

This project consists of the replacement of the existing x- ray equipment with a brand new x-ray and associated systems. The existing area is also reconfigured to provide a larger space within the same room in order to comply with the new equipment clearances. Additionally, the dressing room is converted to the new control room.

Have a similar project? Let’s talk.